We have defined 3 cut sets
Cut Set 1
- met>20 GeV
- hT>100 GeV
- N(TP0 with pT>10)>0
Cut Set 2
- met>20 GeV
- N(jets)>1
- Et(jet 1, L5)>15 GeV
- Et(jet 2, L5)>5 GeV
Cut Set 3
- met>20 GeV
- hT>100 GeV
- N(track/pi0 clusters)>1
- pT(leading track pi0 cluster)>15 GeV
- pT(sub-leading track pi0 cluster)>10 GeV
The table below shows the W+jets and signal expectations for these 3 cut sets.
| Cut Set | N(signal) | N(W+jets) |
|---|---|---|
| 1 | 46.5 | 212250 |
| 2 | 64.3 | 392851 |
| 3 | 13.2 | 19046 |